The site, known as Pasir Ris Neighbourhood 3, sits at the eastern edge of Pasir Ris Town and would mix public and private homes with community amenities. Consultation runs from 23 Nov to 20 Dec.
Bounded by Pasir Ris Drive 3, Pasir Ris Drive 4, Jalan Loyang Besar and Sungei Loyang, the land has been earmarked for housing since Master Plan 1980.
EIA and retained areas
HDB commissioned Tembusu Asia Consulting for an Environmental Impact Assessment covering a 36ha study area of terrestrial, mangrove and intertidal zones.
- 159 plant species recorded, 26 of conservation significance
- 254 fauna species recorded, 25 of conservation significance
- About 8ha of coastal habitat and 5ha of terrestrial greenery retained
- A 15m-wide linear park planned along Sungei Loyang
About 1ha may later be needed for coastal protection, subject to study, and will stay undeveloped in the medium term. Building heights follow aviation limits and step down towards nearby homes.
Background
HDB said its last three Pasir Ris BTO projects each drew an application rate of 3.6 among first-timer families for 4-room flats, and no brownfield site nearby could supply comparable housing in time. In October it cut about 1,200 homes from its Maju Forest and Gillman Barracks plans after feedback.
What it means for the industry
- A new pipeline of public and private housing land in the east will eventually bring civil, piling and residential building works.
- With mangroves and a river next door, contractors should expect tighter environmental monitoring, drainage and pollution controls.
