The new blocks sit next to the university's three existing hostel blocks and combine student housing with industry workspace.
- Site area: 7,638 sq m
- Gross floor area: about 17,553.3 sq m
- Added capacity: 522 rooms, 662 beds
- Completion: early 2029
What's inside
At the core is a 687 sq m innovation centre with 3D printers and workstations so students can build prototypes quickly and cheaply.
Next to it, a sheltered open-air space called Innovation Central will be used to test robots, drones and other physical AI projects.
There will also be 28 work suites with round-the-clock access, leased to start-ups, industry partners and industry-sponsored postgraduate students.
SUTD said rents will be comparable to its existing hostels, and first-year students will live in a dedicated DIVE residential college.
Next phase
After completion, SUTD plans a dedicated drone and robotics facility and a further campus expansion of about 77,000 sq m.
What it means for the industry
- Mixed hostel-and-lab campus buildings call for multi-use design and M&E planning.
- With a robotics facility and a large campus expansion to follow, contractors and consultants should watch for related tenders.
